Scheduling tasks
1.To schedule a task from the standard job, simply drag and drop the task into specific date and shift. If whole set of tasks from the standard job to be scheduled, drag within the name of the standard job and drop in the middle. It will follow the sequence of the standard job set during the configuration of the standard job.
2.A pop-up window will appear depending on the view. Example, if process wasn't added in the hierarchy then a pop-up will show up to enter additional information about the task. Complete the information then click ‘Apply To All’ then ‘Save’.
Rescheduling tasks
1. Simply drag the task to be rescheduled to different time or different shift.
2.Rescheduling multiple tasks can be done by selecting multiple tasks then drag to different shift.
3.If the tasks are linked, simply drag the parent task and the child tasks will follow.